T: 020 7916 1744 E: london@vertexeng.co.uk
Client:
Eastwood Park
Main Contractor:
Various
Architect:
Location:
Eastwood Park Training and Conference Centre, Thornbury, South Gloucestershire
Vertex was appointed to design drainage improvement works in support of the ongoing development strategy for the Eastwood Park Training and Conference Centre in South Gloucestershire which would reinforce the drainage network and improve the drainage connectivity of the 19th Century mansion house into the recently constructed main sewer system.
Vertex worked with management team at Eastwood Park to determine their requirements and develop a cost-effective, optimal solution.
Not in these commissions.
Vertex undertook assessment and design work of the drainage infrastructure serving the mansion house to determine the optimal improvement works.