Eastwood Park

Improving the flow! Reinforcing the drainage network.

Client:

Eastwood Park

Main Contractor:

Various

Architect:

Various

Location:

Eastwood Park Training and Conference Centre, Thornbury, South Gloucestershire

Vertex was appointed to design drainage improvement works in support of the ongoing development strategy for the Eastwood Park Training and Conference Centre in South Gloucestershire which would reinforce the drainage network and improve the drainage connectivity of the 19th Century mansion house into the recently constructed main sewer system.

Vertex worked with management team at Eastwood Park to determine their requirements and develop a cost-effective, optimal solution.

Not in these commissions.

Vertex undertook assessment and design work of the drainage infrastructure serving the mansion house to determine the optimal improvement works.

Eastwood park manor

Related Projects

Carlton tower hotel 2

Carlton Tower Hotel

A £13 million refurbishment with a bespoke glazed roof over a swimming pool and roof-top winter garden.
See More
Bungalow 8 1

Bungalow 8

Structural alterations to provide space for an exclusive nightclub in the St Martin’s Lane Hotel.
See More
© Copyright 2025 Vertex EngineersWeb Design By Toolkit Websites